Honan Square Phase 1 and 2

Honan Square Plaza Phase 1 and 2

This project was the centrepiece of the Environmental Plan (€6m). It included a new wide walkway and amphitheatre in front of the Student Centre/Honan Chapel and O'Rahilly Building. The new walkway is set out from two mature sequoia trees at thewestern end and ends at the east in an amphitheatre with raised seating area. The amphitheatre can be used for casual meetings, outdoor theatre, performance and special events. The Plaza area in front of the Boole has been widened through reduction of the grassed area south of the trees, thus creating an easier throughflow of students when gatherings grow following lectures. As part of Phase II the coblelock of Phase I has been extended at western end across north/south roadway to arch gateway to link up with the widened Boole Plaza. Immediately south of the foregoing a new bus shelter is provided for disabled persons awaiting services.

Project Team

Delivered by the UCC Capital Projects Team

Design Team

O'Riordan Staehli (Architects)
VMRA (Mechanical & Electrical Engineers)
Ewbank Preece O'hEocha (Civil & Structural Engineers)
Bruce Shaw Partnership (Quantity Surveyors)

Contractor

Pierce Contracting Ltd.

Update

Running concurrently with the construction works at Student Centre Project (second phase) this project commenced November/December 2002 and was completed October/November 2003.

 

For further information please contact the Director of Buildings and Estates at mpoland@ucc.ie

Buildings and Estates Office

Foirgnimh agus Eastáit

Western Road, Cork

Top