Embedded Middleware for Optimised Building Operation

Embedded Middleware for Optimised Building Operation

Funding Body:  ITOBO

Project Type: Ph.D

Period: Oct. 2008 – Oct. 2011

Researcher: Alie El-Din Mady

Project Description  

The aim of a fully optimized/automated building operation system is to significantly reduce the energy consumption while grantee an optimal user comfort. In order to achieve this objective, an intelligent middleware layer has to be developed to handle the integration of various building services.

Publications 

1-      A. Mady, M. Boubekeur and G. Provan, "Integrated Simulation Platform for Optimized Building Operations", Proc. International Conference on Intelligent Building and Management (ICIBM 2009), Singapore, 17-19 April 2009.

 2-      A. Mady, M. Boubekeur and G. Provan, "Compositional Model-Driven Design of Embedded Code for Energy-Efficient Buildings", 7th IEEE International Conference on Industrial Informatics (INDIN 2009), Cardiff, UK, 24-26 June 2009.

 3-      M. Behrens, G. Provan, M. Boubekeur and A. Mady, "Model-Driven Diagnostics Generation for Industrial Automation", 7th IEEE International Conference on Industrial Informatics (INDIN 2009), Cardiff, UK, 24-26 June 2009.

 4-      G. Provan, J. Ploennigs, M. Boubekeur, A. Mady and A. Ahmed, "Using BIM Data for Generating and Updating Diagnostic Models", The Twelfth International Conference on Civil, Structural and Environmental Engineering Computing, Funchal, Madeira, Portugal, 1-4 September 2009.

Environmental Research Institute

University College Cork, Lee Road, Cork

Top